Kilauea Class T-ae 26 Parts

End item NSN parts page 1 of 53
Part Number
NSN
NIIN
0-16S Hose Clamp
009656520
00-94-37 Fuel And Oil Servicing Nozzle
009024642
0002392153 Compression Helical Spring
012111640
0003139011 Fluid Filter Element
009763120
0003139012 Fluid Filter Element
000896012
0003139659 Fluid Filter Element
000896012
00044 Plain Encased Seal
001792106
00044 Plain Encased Seal
002607173
000993-743 Bearing
012673046
001-30004 Tapered Roller Bearing Cup
001000366
001909EE Preformed Packing
011704210
001909EECP Preformed Packing
011704210
00214 Flow Switch
008519230
003-3334 Annular Ball Bearing
005555741
0054363 Annular Ball Bearing
001571884
0054363-7 Annular Ball Bearing
001571884
00657D365 PC10 Gear Bearing
001155165
00657D365010 Gear Bearing
001155165
00699067526716 Pipe Elbow
011247765
00699067530911 Pipe Tee
013750318
Page: 1 ...

Kilauea Class T-ae 26

Picture of Kilauea Class T-ae 26

USNS Kilauea (AE-26) was the lead ship of her class of ammunition ships of the United States Navy. She was named for Kilauea, the Hawaiian volcano.

Kilauea was laid down 10 March 1966 by General Dynamics Quincy Shipbuilding Division, Quincy, Massachusetts; launched 9 August 1967; sponsored by Mrs. Michael J. Kirwan, wife of Representative Michael J. Kirwan of Ohio. Kilauea was commissioned 10 August 1968.

Kilauea was decommissioned and placed in service with the Military Sealift Command (MSC) as USNS Kilauea (T-AE-26) on 1 October 1980.

Kilauea was deployed to the Persian Gulf on August 23, 1990 as part of International Naval task force for Operation Desert Shield from 2 September 1990 to 20 January 1991 when she was assigned to the 3rd Marine Amphibious Group, The USS Theodore Roosevelt and USS Midway battlegroups for Operation Desert Storm from 20 January 1991 to April 17, 1991.

Kilauea was deployed to East Timor as part of the Australian-led INTERFET peacekeeping task force from 20 September to 2 October 1999.

Compare Now »
Clear | Hide