Cvn Nuclear Reactor Boundary Area Parts

(Page 3) End item NSN parts page 3 of 22
Part Number
NSN
NIIN
01-472-0190-3 ASSY B Electrical Switch
011239352
01-472-0308-3 Electrical Switch
011239352
01-79030 Particulate Filter
000408453
010-19359 O-ring
001661079
010056-059 Lock Washer
006143552
010079-015 Cartridge Fuse
002810225
0104-02-12 O-ring
002500221
0104-02-20 O-ring
002651075
0111.0057.J Machine Screw
012828179
012-21072-01 Annular Ball Bearing
001565046
012-21092-01 Annular Ball Bearing
002360559
012226019 Ceramic Dielectr Fixed Capacitor
001135465
0130-624-4050 Retaining Ring
008047645
0131-1150T Non Wire Wound Variable Resistor
012460394
0142-7377 O-ring
008331428
014991 Film Fixed Resistor
004811110
0150091-00 Round Plain Nut
001856389
01550 Annular Ball Bearing
005545238
01550A Annular Ball Bearing
005545238
01550AB1 Annular Ball Bearing
005545238
Page: 3 ...

Cvn Nuclear Reactor Boundary Area

Picture of Cvn Nuclear Reactor Boundary Area

In the United States Navy, Refueling and Overhaul (ROH) refers to a lengthy process or procedure performed on nuclear-powered naval ships, which involves replacement of expended nuclear fuel with new fuel and a general maintenance fix-up, renovation, and often modernization of the entire ship. In theory, such a process could simply involve only refueling or only an overhaul, but nuclear refueling is usually combined with an overhaul. An ROH usually takes one to two years for submarines and up to almost three years for an aircraft carrier, performed at a naval shipyard. Time periods between ROHs on a ship have varied historically from about 5–20 years (for submarines) to up to 25 years (for Nimitz-class aircraft carriers). For modern submarines and aircraft carriers, ROHs are typically carried out about midway through their operating lifespan. There are also shorter maintenance fix-ups called availabilities for ships periodically at shipyards. A particularly lengthy refueling, maintenance, and modernization process for a nuclear aircraft carrier can last up to almost three years and be referred to as a Refueling Complex Overhaul (RCOH).

Compare Now »
Clear | Hide