Ticonderoga Class Cg (47) Parts

(Page 309) End item NSN parts page 309 of 498
Part Number
NSN
NIIN
1549388 Fluid Filter Element
004346557
1549650-20 Plain Encased Seal
000796484
1549650PC20 Plain Encased Seal
000796484
15497-002 Tip Jack
002645316
1549789PT1 Nonmetallic Hose
009225130
1549789PT4 Nonmetallic Hose
009225138
154D672-22 Annular Ball Bearing
005543359
154EF1-4X1-8 Screw Stem Shutoff Cock
003913782
154SIZE1 1-2 Hose Cap
002423242
155-055881-003 Immer Electrical Heating Element
011216273
155-0680 Unitized Semiconductor Devices
011494743
155-8585-001 Loop Clamp
010499659
1550-SD Trip Balance
004017195
1550-SD Trip Balance
009556486
1550062-17 Hexagon Head Cap Screw
010777100
1550306-2 Ring
003800293
1550306-5 Ring
003800294
1550306PC2 Ring
003800293
1550306PC5 Ring
003800294
15508-7 Paper Metallized Fixed Capacitor
001707170
Page: 309 ...

Ticonderoga Class Cg (47)

Picture of Ticonderoga Class Cg (47)

USS Ticonderoga (DDG/CG-47) was a guided-missile cruiser of the United States Navy. Homeported in Pascagoula, Mississippi, the "Tico" was the lead ship of her class.

Ticonderoga was the first combatant ship to feature the Aegis combat system (a limited version of the system had been tested on Norton Sound). This allows the ship to track and engage multiple targets (aircraft) much more effectively than any ship previously.

CG-47 is the fifth United States Navy vessel to carry on the name Ticonderoga. The ship was the fifth ship named for the Capture of Fort Ticonderoga in 1775.

The United States Navy built the first Aegis cruisers using the hull and machinery designs of Spruance-class destroyers. Ticonderoga was ordered as a guided missile destroyer, but redesignated as a cruiser before she was laid down.

The contract to build DDG-47 Ticonderoga was awarded to Ingalls Shipbuilding on 22 September 1978. On 1 January 1980, she was redesignated as a guided missile cruiser, CG-47. Her keel was laid down on 21 January 1980, the 35th anniversary of the devastating kamikaze attack on the Essex-class aircraft carrier Ticonderoga. CG-47 was launched on 25 April 1981 and was delivered on 13 December 1982. She was commissioned on 22 January 1983 with First Lady Nancy Reagan, the ship's main sponsor, having the honor of christening the ship on 16 May 1981.

Compare Now »
Clear | Hide