Armored Vehicle Launch Bridge (m60a1 & M48a5) Parts

(Page 8) End item NSN parts page 8 of 24
Part Number
NSN
NIIN
10905682 Utility Outlet Assembly
010225325
10905983-2 Track Suspens Pivot Arm Assembly
008712855
10907612 Vehicular Seat Support
008396641
10910174 Flat Washer
007289957
10910174-22 Flat Washer
007289957
10911553 Sediment Strainer Element
008865854
10911888 Gasket
008889403
10912270 Gasket
004932938
10915376 Vehicular Operation Panel
001682690
10915509 Sleeve Bearing
009749258
10916089 Hydraulic Brak Cylinder Assembly
009782068
1091629 Paper Dielectric Fixed Capacitor
000502023
10924484 Rod End Connector
009836938
109296 Tapered Roller Bearing Cup
001000337
10933104 Pipe Bushing
009133954
10933104-1 Pipe Bushing
009133954
10933573 Lampholder
009787337
10945182 Fluid Filter
000253493
10946915 Electrical Fuel Pump
009234248
10951865 Angle Bracket
001682848
Page: 8 ...

Armored Vehicle Launch Bridge (m60a1 & M48a5)

Picture of Armored Vehicle Launch Bridge (m60a1 & M48a5)

The M60 AVLB is an armored vehicle based on the M60 Patton main battle tank chassis used for the launching and retrieval of a 60 feet (18 m) scissors-type bridge. The AVLB consists of three major sections: the launcher, the vehicle hull, and the bridge.

The M60 AVLB is based on a M60 Patton tank chassis, but instead of the tank's gun turret, it is equipped with a bridge launcher integrated into the chassis and mounted on top. When emplaced, the bridge is capable of supporting tracked and wheeled vehicles with a military load bearing capacity up to Class 70. The bridge can be retrieved from either end. The roadway width of the AVLB is 12 feet 6 inches (3.81 m). During deployments, bridge emplacement can be accomplished in 2 minutes, and retrieval can be accomplished in 10 minutes under armor protection.

As of 1996, the U.S. Marines had an inventory of 55 bridges and 37 launchers.

The U.S. Army and Marine Corps are planning to replace the AVLB with the DRS Technologies Joint Assault Bridge (JAB), which is an M1 Abrams tank chassis combined with an 18.3 metres (60 ft)-long scissor bridge. The M60-based AVLB was found to be slower and unable to keep pace with Abrams tanks and M2 Bradley armored vehicles, and its age was making it difficult to maintain and sustain with parts becoming obsolete. The JAB also has a faster deployment time, with a set-up of three minutes compared to AVLB’s six-minute set-up. First deliveries are planned in mid-2017, with low-rate initial production expected to be reached in 2019.

Compare Now »
Clear | Hide