Mars Class T-afs 1 Parts

End item NSN parts
Filter By: Bearing Balls
page 1 of 1
Part Number
NSN
NIIN
1049729 Bearing Ball
009327421
804374C2BX Bearing Ball
011922075
A-807828C ITEM 13 Bearing Ball
011922075
C-26-01-0008 Bearing Ball
009327421
C26-1-8 Bearing Ball
009327421
E17502-01 PIECE 40 Bearing Ball
012710977
Page:

Mars Class T-afs 1

Picture of Mars Class T-afs 1

USS Mars (AFS‑1), the third United States Navy ship to bear the name, was laid down by the National Steel and Shipbuilding Company in San Diego, California, on 5 May 1962; launched on 15 June 1963, sponsored by Mrs. Clyde Doyle, widow of Representative Clyde Doyle of California; and commissioned at Long Beach Naval Shipyard on 21 December 1963, with Captain Russel C. Medley in command.

Mars was the first of a new class that was intended to replace three types of supply ships: the AF (Store Ship), AKS (Stores Issue Ship), and AVS (Aviation Supply Ship). Two innovations were Boeing UH‑46 helicopters and an automatic highline shuttle transfer system to make a rapid transfer of supplies possible. To speed replenishment processing, Mars became the first ship in the Pacific Fleet to be equipped with a UNIVAC 1104 computer system.

Assigned to Service Squadron 1 (ServRon 1), Mars left San Diego on 16 March 1964 for Acapulco, Mexico, for shakedown, returning to San Diego on Easter Sunday. On 1 September she departed for the western Pacific, arriving at Yokosuka, Japan, on the 23rd. With Yokosuka as home port, the combat storeship operated from the Philippines to the South China Sea through the rest of the year.

Compare Now »
Clear | Hide