(peculiar) Spec Electronics/aircraft/(e2c) Parts

End item NSN parts
Filter By: Cable Assemblys
page 1 of 3
Part Number
NSN
NIIN
10397808 Cable Assembly
012596561
121261-1 Cable Assembly
000064365
123AV52732-3 Cable Assembly
013468190
123SAV2718-1 Cable Assembly
012590748
123SAV3112-1 Cable Assembly
012596561
123SAV51401-1 Cable Assembly
010166347
123SAV52163-3 Cable Assembly
013252437
123SAV52701-1 Cable Assembly
012596566
123SAV52702-1 Cable Assembly
012596783
123SAV52703-1 Cable Assembly
012596567
123SAV52705-1 Cable Assembly
012596563
123SAV52706-1 Cable Assembly
012596564
123SAV52707-1 Cable Assembly
012596565
123SAV52711-1 Cable Assembly
012612948
123SAV52712-1 Cable Assembly
012572697
123SAV52714-1 Cable Assembly
012621816
123SAV52715-1 Cable Assembly
012581646
123SAV52752-1 Cable Assembly
012596784
123SAV52753-1 Cable Assembly
012684117
123SAV52754-1 Cable Assembly
012596785
Page: 1

(peculiar) Spec Electronics/aircraft/(e2c)

Picture of (peculiar) Spec Electronics/aircraft/(e2c)

A work breakdown structure (WBS), in project management and systems engineering, is a deliverable-oriented breakdown of a project into smaller components. A work breakdown structure is a key project deliverable that organizes the team's work into manageable sections. The Project Management Body of Knowledge (PMBOK 5) defines the work breakdown structure as a "A hierarchical decomposition of the total scope of work to be carried out by the project team to accomplish the project objectives and create the required deliverables."

A work breakdown structure element may be a product, data, service, or any combination thereof. A WBS also provides the necessary framework for detailed cost estimating and control along with providing guidance for schedule development and control.

WBS is a hierarchical and incremental decomposition of the project into phases, deliverables and work packages. It is a tree structure, which shows a subdivision of effort required to achieve an objective; for example a program, project, and contract. In a project or contract, the WBS is developed by starting with the end objective and successively subdividing it into manageable components in terms of size, duration, and responsibility (e.g., systems, subsystems, components, tasks, subtasks, and work packages) which include all steps necessary to achieve the objective.

Compare Now »
Clear | Hide