Bridge Armor Vehicle (avlb) - Model M60a1 Parts

End item NSN parts
Filter By: Nonmetallic Hose Assemblys
page 1 of 1
Part Number
NSN
NIIN
10865437 Nonmetallic Hose Assembly
007660903
13211E7904-2 Nonmetallic Hose Assembly
009866932
152975 Nonmetallic Hose Assembly
009866932
272021-2 Nonmetallic Hose Assembly
009866932
2930007660903 Nonmetallic Hose Assembly
007660903
4720-766-0903 Nonmetallic Hose Assembly
007660903
8761491-3 Nonmetallic Hose Assembly
004101184
981088 Nonmetallic Hose Assembly
009866932
A1150-2 Nonmetallic Hose Assembly
009866932
D7884-58-9 Nonmetallic Hose Assembly
009866932
FB9462-02 Nonmetallic Hose Assembly
009866932
K2396 Nonmetallic Hose Assembly
009866932
MIL-H-25579-16 Nonmetallic Hose Assembly
007660903
MS28741-8-0094 Nonmetallic Hose Assembly
009573047
MS8005M144A Nonmetallic Hose Assembly
007660903
R20821 Nonmetallic Hose Assembly
007660903
Page:

Bridge Armor Vehicle (avlb) - Model M60a1

Picture of Bridge Armor Vehicle (avlb) - Model M60a1

The M60 AVLB is an armored vehicle based on the M60 Patton main battle tank chassis used for the launching and retrieval of a 60 feet (18 m) scissors-type bridge. The AVLB consists of three major sections: the launcher, the vehicle hull, and the bridge.

The M60 AVLB is based on a M60 Patton tank chassis, but instead of the tank's gun turret, it is equipped with a bridge launcher integrated into the chassis and mounted on top. When emplaced, the bridge is capable of supporting tracked and wheeled vehicles with a military load bearing capacity up to Class 70. The bridge can be retrieved from either end. The roadway width of the AVLB is 12 feet 6 inches (3.81 m). During deployments, bridge emplacement can be accomplished in 2 minutes, and retrieval can be accomplished in 10 minutes under armor protection.

As of 1996, the U.S. Marines had an inventory of 55 bridges and 37 launchers.

The U.S. Army and Marine Corps are planning to replace the AVLB with the DRS Technologies Joint Assault Bridge (JAB), which is an M1 Abrams tank chassis combined with an 18.3 metres (60 ft)-long scissor bridge. The M60-based AVLB was found to be slower and unable to keep pace with Abrams tanks and M2 Bradley armored vehicles, and its age was making it difficult to maintain and sustain with parts becoming obsolete. The JAB also has a faster deployment time, with a set-up of three minutes compared to AVLB’s six-minute set-up. First deliveries are planned in mid-2017, with low-rate initial production expected to be reached in 2019.

Compare Now »
Clear | Hide