Model or part number: 7592421P1
About this product
C/o wattmeter, switches, ac volt meter, dc volt meter, ac pump, vacuum chamber, air reservoir, pressure gauge, mercury u-tube, water u-tube, and stop watch
Factory New, New Material, New Surplus, Overhauled, Serviceable, Repairable, and AS Removed / Used material will be accompanied by a Certificate of Conformance, and any other documents/trace when applicable. We have a 7 year record retention.
We are committed to quality and follow an AS9120 quality management system. AeroBase Group is HAZMAT certified and registered with DDTC,
ITAR, and Aviation Suppliers Association (ASA). All products are 100% inspected.
Quality Commitment »
Delivery of IN-STOCK orders ship same-day when order is placed before 2:00 PM EST.
Delivery dates for NON-STOCK items are estimates based on current backlog and are subject to confirmation at the time of order.
An item designed specifically for making examinations of pneumatic system components, such as valves, pressure regulators, accumulators, hose lines, pressure switches, and the like. May include facilities for checking pneumatic systems for leakage and performance. See also test set, leakage, guided missile drainage equipment.
Options can be exercised as to specific method of preservation or dod approved packaging materials to be used. however, basic preservation method shall be retained, supplemental data shall be complied with, and unit package dimensions shall not be increased by more than one inch. equal or better protection shall be given the item and there shall be no increase in the package cost.
No special marking.
Physical protection.
Special requirements. see specific instructions or drawings provided.
No requirement.
Hydraulic and Pneumatic Instruments and Apparatus Except Industrial Process Control
Measuring, Testing, Control Instruments
Automatic Regulating Or Controlling Instruments and Apparatus, N.e.s.
No special type of cargo code applicable.
Communications/electronics, other than sigint/ew or comsec repair parts and components.
Trailers, vehicles, machinery, shop and warehouse equipment and supplies including special tools and equipment, ground servicing.
Shipment is not a consolidation and does not exceed 84 inches in any dimension.
High sensitivity, category ii, aa&e, classified confidential
Code | Definition |
---|---|
FN | Factory New. Parts manufactured by the OEM and includes manufacturer certification. |
NE | New. Parts manufactured by the OEM. May include manufacturer certification or company certification. |
NS | New Surplus. New material item purchased from excess inventory. |
OH | Overhauled. Product has been rebuilt and tested in accordance with the manufacturer's specifications by a repair shop (MRO). |
SV | Serviceable product. |
AR | As Removed. Product removed from aircraft or platform with no guarentee on the functionality of the part. |
RP | Repairable. Product can be repaired by a MRO and be given a FAA 8130 or EASA Form 1 certification. |
Part Number | RNVC | RNAAC | DAC | CAGE |
---|---|---|---|---|
7592421P1 | 2 | MB | 4 | 99521 |
Name | No. Items | |||
---|---|---|---|---|
[You must be logged in to use lists] |