change location
321-802-5889
321-733-7477
Part Information
Vbelow centerline opening, gasket seal, humidity indicator, pressure relief valve, desicant port, stacking capability, tiedown rings, foam cradle system, 4-way forklift entry, handles on cover, quick release latches on base. Air filling valve, forklifting handleson level, integral base-skid design. Suppgprotect twelve bsu-49 bomb fins during transportation and storage, whichwill be used on the mk-82 gp bomb. This container is a new configuration andmaterial version of the cnu-335/e.
Part Number | RNVC | RNAAC | DAC | CAGE |
---|---|---|---|---|
200027170 | 2 | ZZ | 3 | 98747 |
Code | Definition |
---|---|
FN | Factory New. Parts manufactured by then OEM and includes manufacturer certification. |
NE | New. Parts manufactured by the OEM. May include manufacturer certification or company certification. |
NS | New Surplus. New material item purchased from excess inventory. |
OH | Overhauled. Product has been rebuilt and tested in accordance with the manufacturer's specifications by a repair shop (MRO). |
SV | Serviceable product. |
AR | As Removed. Product removed from aircraft or platform with no guarentee on the functionality of the part. |
RP | Repairable. Product can be repaired by a MRO and be given a FAA 8130 or EASA Form 1 certification. |