change location
321-802-5889
321-733-7477
Part Information
Processing time varies from 5 minutes dry to dry to 13 minutes dry to dry; standard industrial cycles are short 8.5 minutes and long-about 12 minutes dry to dry; individually cut sheet film are manually federal into the processor one sheet at a time; developer, fixer and drying temperature are automatically controlled within the processor to specified fixed temperatures; film is transported through rollers mounted in a rack
Part Number | RNVC | RNAAC | DAC | CAGE |
---|---|---|---|---|
FP2000 INDUSTRIAL | 2 | ZZ | 2 | 8Y572 |
Code | Definition |
---|---|
FN | Factory New. Parts manufactured by then OEM and includes manufacturer certification. |
NE | New. Parts manufactured by the OEM. May include manufacturer certification or company certification. |
NS | New Surplus. New material item purchased from excess inventory. |
OH | Overhauled. Product has been rebuilt and tested in accordance with the manufacturer's specifications by a repair shop (MRO). |
SV | Serviceable product. |
AR | As Removed. Product removed from aircraft or platform with no guarentee on the functionality of the part. |
RP | Repairable. Product can be repaired by a MRO and be given a FAA 8130 or EASA Form 1 certification. |