Cvn Nuclear Reactor Boundary Area Parts

End item NSN parts
Filter By: Electrical Contacts
page 1 of 1
Part Number
NSN
NIIN
1004-845 Electrical Contact
007255836
1190279 Electrical Contact
002415704
1315080 Electrical Contact
005905911
174A5315G1 Electrical Contact
007255836
1777320 Electrical Contact
002017241
191675A Electrical Contact
000047758
198730K01 Electrical Contact
000047761
198730K1 Electrical Contact
000047761
198732K1 Electrical Contact
000047762
198756-A00 Electrical Contact
000047763
198756A Electrical Contact
000047763
199571A Electrical Contact
000047765
2046-152 Electrical Contact
000047762
23-1570-2 Electrical Contact
005905911
23-1570-A2 Electrical Contact
005905911
26493-22-3 Electrical Contact
002584208
3000-0004 Electrical Contact
005905911
32J682PC30 Electrical Contact
002415704
32J682PT30 Electrical Contact
002415704
32J759SUB15ITEM2 Electrical Contact
002415704
Page:

Cvn Nuclear Reactor Boundary Area

Picture of Cvn Nuclear Reactor Boundary Area

In the United States Navy, Refueling and Overhaul (ROH) refers to a lengthy process or procedure performed on nuclear-powered naval ships, which involves replacement of expended nuclear fuel with new fuel and a general maintenance fix-up, renovation, and often modernization of the entire ship. In theory, such a process could simply involve only refueling or only an overhaul, but nuclear refueling is usually combined with an overhaul. An ROH usually takes one to two years for submarines and up to almost three years for an aircraft carrier, performed at a naval shipyard. Time periods between ROHs on a ship have varied historically from about 5–20 years (for submarines) to up to 25 years (for Nimitz-class aircraft carriers). For modern submarines and aircraft carriers, ROHs are typically carried out about midway through their operating lifespan. There are also shorter maintenance fix-ups called availabilities for ships periodically at shipyards. A particularly lengthy refueling, maintenance, and modernization process for a nuclear aircraft carrier can last up to almost three years and be referred to as a Refueling Complex Overhaul (RCOH).

Compare Now »
Clear | Hide