Cvn Nuclear Reactor Boundary Area Parts

(Page 21) End item NSN parts page 21 of 22
Part Number
NSN
NIIN
12490-100 O-ring
002500236
12490-23 O-ring
002651075
125-4 Electrical Receptacle Connector
000820481
125008-38 Lug Terminal
001567345
1251-0007 Electrical Receptacle Connector
000820481
125X17 Tapered Roller Bearing Cup
001000295
12616694-9 Round Plain Nut
001856462
12619026 Bearing Retainer And Rollers
000526746
1261F88G03 PIECE 54 Electrical Terminal Block
014699906
1263982-2 V Belt
005284753
126452-007 Ring Spacer
013207120
12675PC149 Round Plain Nut
001856389
12675PC150 Key Washer
001860967
12676PC185 Round Plain Nut
001856389
12676PC187 Key Washer
001860967
127688 Key Washer
001860967
127711 Round Plain Nut
001856389
127713 Round Plain Nut
001856462
128-2VC Wire Rope Swaging Sleeve
004315536
12855 Helical Compression Spring Seat
000361555
Page: 21

Cvn Nuclear Reactor Boundary Area

Picture of Cvn Nuclear Reactor Boundary Area

In the United States Navy, Refueling and Overhaul (ROH) refers to a lengthy process or procedure performed on nuclear-powered naval ships, which involves replacement of expended nuclear fuel with new fuel and a general maintenance fix-up, renovation, and often modernization of the entire ship. In theory, such a process could simply involve only refueling or only an overhaul, but nuclear refueling is usually combined with an overhaul. An ROH usually takes one to two years for submarines and up to almost three years for an aircraft carrier, performed at a naval shipyard. Time periods between ROHs on a ship have varied historically from about 5–20 years (for submarines) to up to 25 years (for Nimitz-class aircraft carriers). For modern submarines and aircraft carriers, ROHs are typically carried out about midway through their operating lifespan. There are also shorter maintenance fix-ups called availabilities for ships periodically at shipyards. A particularly lengthy refueling, maintenance, and modernization process for a nuclear aircraft carrier can last up to almost three years and be referred to as a Refueling Complex Overhaul (RCOH).

Compare Now »
Clear | Hide